QDZ5310SG15 Firefighting Vehicle
December 18, 2018
HOWO GAS SUPPLY FIRE TRUCK
December 19, 2018
Show all

HOWO 15000L WATER TANK FIRE TRUCK

  1. Technical parameters
ModelParametersothers
Overall Dimension10400×2500×3580mm
GVW32000kg
Engine ModelD10.38-40
Engine Power276KW
Wheelbase4600+1350mm
Driving Type6×4
Max.speed90km/h
Emission Standard9726mlEuro 4
Fire pump rated flow50L/s@1.0Mpa;7L/s@4.0MpaVacuum pump
water monitor rated flow50L/s@0.7MPa
Water monitor rangeWater range≥60m
Passengers6
Approach angle≥16°
Departure angle≥12°

2.Fire performance parameters:

  Item                ParametersParametersothers
1Water tank capacitywater15000kg
2Fire pump modelCB40.10/7.50-XZ
3Fire pump performancePressure1:1.0Mpa flow:50L/S

Pressure2:4.0Mpa flow:7L/S

Use vacuum pump to priming water
4the installation site of fire pumprear
5The quantity of fire pump water outlet4
6Pressure gauge 0-4.0 MPa2.6 level
7Vacuum gauge-0.1- 0.15 MPa2.6 level
8

 

Water monitor

(PS50W)

Injection pressure≥60m@0.7Mpa
 Depression/Elevation angle-30-+70°
Turning angle 360°
  1. Chassis

1、main parameters of the chassis:

Chassis NoZZ5347V4647D1 6×4 

 

 

ManufacturerChina National Heavy Duty Truck Group Co., Ltd
Engine276KW
Displacement9726ml
Emission standardsEuro 4
Wheel base4600+1350mm
Maximum weight32000kg
Highest speed90 km/h

2、Cabin

Structureflat、4 doors、double row of seats
Passenger No6
Drive typeLeft hand drive
 EquipmentBesides original equipments on chassis,add:100W siren、long line fire lights、marker lamp、outline marker lamp、PTO and so on
DashboardSpeed/fuel/rotating speed dashboard 

 

 

 


III
. Upper bodywork

1.The Overall layout

The overall layoutThe front and two sides of the middle of the body are storage compartments. It is built-in type independent water tank in the middle position of the central compartment. The back of the body is pump compartment.
The aluminum alloy shutters are installed at both sides of the body and the back of the pump compartment, the ladders are installed on the back of the body at the right side.
Technological requirementsAll welding panels and skeleton steels are through strict process of anti-rust, anti-corrosion and phosphating pickling. All the accessories、standard components are processed of galvanization、electroplate、Dacromet treatments and so on. After completing welding of the tank, the tank will be clear up and removed possible defects such as empty solder. And then it will be through 24-hour hydrostatic test to assure no leakage.
The overall layout